Projects in Construction
Name 
Airfield Electrical RehabilitationThe project will rehabilitate and improve the reliability of the airfield electrical system. The work consists of the demolition of existing electrical ductbanks; installation of new electrical ductbanks with associated circuit cable; replacement of runway /taxiway edge and centerline lights; replacement of runway touchdown zone lights; replacement and/or upgrades of airfield signage; replacement and/or reconfiguration of windcones; electrical vault improvements; and new constant current regulators, and reconfiguration/improvements to the airfield lighting control and monitoring system.

Airfield Lighting VaultThe project will relocate the existing Airfield Lighting Vault building and related airfield electrical infrastructure to allow for the North Terminal project to be developed. The work consists constructing a new 4600 SF building to house equipment associated with the airfield lighting system. Airfield ductbanks will be re-routed around the proposed apron area. Once the new building is complete and operational, the existing vault building will be demolished to allow construction to begin on the North Terminal.



 

© Copyright 2014, Louis Armstrong New Orleans International Airport. All rights reserved.

Site designed by Bizzuka New Orleans Web Design