Capital improvements
Capital Improvements > Projects in Design > Airport Cargo Road Rehabilitation

<< Return

Airport Cargo Road Rehabilitation

This project involves design and engineering services for the rehabilitation and enhancements to the existing roadway system throughout the cargo/general aviation area of the airport adjoining the southwest portion of the airfield. Anticipated repairs and rehabilitations include fire hydrant relocations, mill and overlay of identified asphaltic concrete pavements, roadway base repairs, selective concrete slab replacements, intersection radii improvements and miscellaneous utility adjustments where required for roadway improvements, additional street lighting, roadway signage and stripping, and landscaping. The project also includes design improvements to the existing storm water drainage system on the West Apron (Ramp 7). The project does not include Crofton Road which is governed by the City of Kenner.

The following roadway segments within the cargo and general aviation area are included:

Service Road

East Airline Drive (from Crofton Rd. to Service Road)

South Firehouse Road

East Access Road

Middle Access Road

West Access Road

The solicitation can be found here.

 

© Copyright 2014, Louis Armstrong New Orleans International Airport. All rights reserved.

Site designed by Bizzuka New Orleans Web Design