Print this page   Close this window

Louis Armstrong New Orleans International Airport



Capital improvements
Projects in Construction
Name 
ASR-9 Facility Relocation

This Project involves the relocation of the existing Federal Aviation Administration Airport Surveillance Radar (ASR) 9 navigational aid facilities that are located in the footprint of the North Terminal Project. It also includes installation of the new Low Level Windshear Alert System–Wind Measuring Equipment (LLWAS-WME). The Project work consists of site preparation, construction of a new building, installation of new electrical and fiber duct banks, tower erection, installation of equipment and demolition of the existing LLWAS-CFW sites.

North Terminal ProjectOn April 17, 2013, the Airport announced its decision to move forward with a Long-Term Strategic Development Plan to construct a new terminal facility. Five alternatives were considered. Four of the alternatives - No Action Alternative, Refurbishment Alternative Southside Alternative, and Westside Alternative - involve rehabilitation or new construction on the southeast side of the Airport on or near the current terminal location. The preferred alternative is the Northside Alternative located on the northeast side of the Airport property.
Storm Water Pump Station ProjectConstruction of a new storm water drainage pump station in the northwest corner of the Louis Armstrong New Orleans International Airport located in Kenner, LA.