Print this page   Close this window

Louis Armstrong New Orleans International Airport



Capital improvements
Projects in Construction
Name 
Airfield Electrical Rehabilitation The project will rehabilitate and improve the reliability of the airfield electrical system. The work consists of the demolition of existing electrical ductbanks; installation of new electrical ductbanks with associated circuit cable; replacement of runway /taxiway edge and centerline lights; replacement of runway touchdown zone lights; replacement and/or upgrades of airfield signage; replacement and/or reconfiguration of windcones; electrical vault improvements; and new constant current regulators, and reconfiguration/improvements to the airfield lighting control and monitoring system.
Airport Cargo Road Rehabilitation Airport Cargo Roads Rehabilitation - This project seeks design services for the rehabilitation and enhancements to the roadway system throughout the cargo/general aviation area of the airport, adjoining the southwest portion of the airfield.